Home Solutions CMMC Readiness

Solutions · CMMC · The DoD Assurance Lane

CMMC readiness, scored the way a C3PAO scores it.

A policy PDF is not an implementation. We score all 110 controls at the assessment-objective level, write the SSP from your live configuration, and gate everything behind a mock assessment — because we passed the same assessment we prepare you for.

  1. Mock assessmentThe release gate before your C3PAO
  2. Gap assessmentAll 110 controls, at the objective level
  3. SSP, POA&M, remediationWritten from the live environment
  4. CUI boundaryWhere CUI actually lives, mapped and verified

Reviewed October 6, 2026: the planned Phase II expansion is suspended. Maintain applicable self-assessments and safeguarding obligations, and confirm contract amendments or modifications before pursuing a third-party assessment. Read the current-status playbook.

The number that decides whether you can bid

Under DFARS 252.204-7019/7020, applicable solicitations require a current NIST SP 800-171 self-assessment score in SPRS as a condition of award — and primes screen subcontractors on it. The DoD Assessment Methodology starts you at 110 and subtracts weighted deductions of 5, 3, or 1 points per unimplemented requirement, down to a floor of −203. Use evidence to determine the starting score; there is no assumed result for a first assessment.

110controls scored
−203→110SPRS score range
5 / 3 / 1points lost per gap
320assessment objectives tested

What the engagement covers

Why it works: this is the exact sequence inDirectIT ran on its own environment to earn CMMC Level 2 under 32 CFR Part 170 — and the sequence Allyon ran to its June 2026 certification. Same runbook, every time.

Questions contractors ask us

What does a CMMC Level 2 gap assessment cost?

Pricing depends on the assessed boundary, evidence readiness, and agreed deliverables. Ours is fixed-scope: CUI boundary definition, scoring against all 110 controls, your real SPRS score, and a sequenced remediation register — priced up front, no discovery-phase creep.

How long does CMMC Level 2 readiness actually take?

Readiness depends on scope, existing controls, staffing, and evidence quality. Our Factory model compresses the technical baseline into a 12–14 week build because the playbook, templates, and evidence structures already exist — you're inheriting a working pattern, not funding an experiment.

What happens if we don't have a System Security Plan?

Without an SSP there is no submittable assessment at all — the DoD methodology treats it as a gate, not a deduction. And an inflated score submitted anyway is False Claims Act exposure. The SSP is written from your live configuration during remediation, never before it.

Can we do the self-assessment ourselves?

Yes — and you should start there. Score yourself free at CMMC Calculator using the official DoD methodology. Where contractors get in trouble is scoring optimistically: your SPRS submission is a federal representation, and the honest number is the one that survives a C3PAO.

Path 01

Request your gap assessment.

Tell us where the program stands and we'll come back with scope, timeline, and a fixed price. Or email rj@indirectit.com directly.