Home Solutions GCC High Migration

Solutions · GCC High

GCC High migration, engineered by people who live there.

Our own CMMC Level 2 certified environment runs in GCC High, the same federal cloud we migrate you into. We scope licensing, feature gaps, identity, and mail flow from that experience, so none of them first show up on your invoice.

  1. Tenant and identityEntra ID, Conditional Access baseline
  2. Mail and data migrationStaged cutover, Purview CUI labeling and DLP
  3. Boundary hardeningIntune, Defender, WDAC, audit logging
  4. Scope and tenant designCUI boundary first, then the tenant

The decision before the migration

Your contracts decide whether you need GCC High. ITAR/EAR technical data and the data-sovereignty requirements that come with it, the incident-reporting duties in DFARS 252.204-7012 paragraphs (c) through (g), and prime flow-downs determine whether commercial M365 (properly configured), an enclave, or a full GCC High migration fits. We wrote the decision model down in GCC High vs. Commercial M365; read it before anyone quotes you licensing.

How the migration runs

Only some of your people handle CUI? CUIckStart is our managed CUI enclave on GCC High: only the named people who handle CUI move into the boundary, and the rest of the business and the corporate network stay out of the assessment scope. Standard is ready in 60 days, Express in 14. See how it works or cuickstart.com.

The phase-by-phase plan is public. The GCC High Migration Timeline guide walks through the full sequence: what moves when, what breaks if you do it in the wrong order, and where the long-lead items are.

Questions contractors ask us

Do we need GCC High to handle CUI?

Not always. It depends on whether your data carries ITAR/EAR or other sovereignty requirements. Many contractors can meet 800-171 in commercial M365 with the right configuration, while export-controlled CUI generally points to GCC High. We scope this from experience, since our own certified environment runs there.

How long does a GCC High migration take?

It depends on tenant complexity, mail volume, and identity architecture, which is why we publish the phase-by-phase plan in the GCC High Migration Timeline guide. The order stays the same: identity first, then mail, then workloads, with the CUI boundary configured before data moves so the migration itself generates assessment evidence.

Can we run a hybrid, with some users in GCC High and some in commercial?

Yes. An enclave architecture puts only CUI-touching users and workloads in the federal cloud, which shrinks both licensing cost and assessment scope. Whether it's cheaper than a full migration depends on how cleanly your CUI population separates. That is a boundary question first and a licensing question second. CUIckStart is that enclave as a managed product.

Scope the move

Scope the assessment and the migration as one decision.

Scoping both together means you only buy the architecture once. Or email rj@indirectit.com directly.